PROJECTS

PROJECTS

Keynote Projects

Projects carried out by 7-solutions

  • Project Management of the steel frame element of 28 student accommodation blocks at the University of Sussex West Slope Residences.
  • Obtained NHBC, BOPAS and Premier Guarantee acceptance for the ilke Homes Ltd modular houses.
  • Gained NHBC acceptance for the New FusionX light gauge steel frame system.
  • Prepared standard details for the timber frame element of the Barratt Homes houses.
  • Worked with the Steel Construction Institute to publish documents on the re-use of steel-framed structures.


Projects during Mark Jowett’s career in Offsite Construction

  • First seven-storey timber frame structure in the UK.
  • First 10-storey steel frame structure with concrete floors by Kingspan Profiles and Sections.
  • First 10-storey steel frame structure with light gauge steel floors by Fusion Building Systems.
  • Timber frame Production Unit for Stewart Milne Timber Systems.
  • Assisted Redrow in developing the design of their £60k house for the Deputy Prime Minister’s office.
  • Accreditations to facilitate the design of a 23-storey modular steel frame structure for Elements Europe.


Get in touch

University of Sussex East Slope

Keynote ProjectsRedrow £60K house for Deputy Prime Minister’s Office