PROJECTS
Keynote Projects
Projects carried out by 7-solutions
- Project Management of the steel frame element of 28 student accommodation blocks at the University of Sussex West Slope Residences.
- Obtained NHBC, BOPAS and Premier Guarantee acceptance for the ilke Homes Ltd modular houses.
- Gained NHBC acceptance for the New FusionX light gauge steel frame system.
- Prepared standard details for the timber frame element of the Barratt Homes houses.
- Worked with the Steel Construction Institute to publish documents on the re-use of steel-framed structures.
Projects during Mark Jowett’s career in Offsite Construction
- First seven-storey timber frame structure in the UK.
- First 10-storey steel frame structure with concrete floors by Kingspan Profiles and Sections.
- First 10-storey steel frame structure with light gauge steel floors by Fusion Building Systems.
- Timber frame Production Unit for Stewart Milne Timber Systems.
- Assisted Redrow in developing the design of their £60k house for the Deputy Prime Minister’s office.
- Accreditations to facilitate the design of a 23-storey modular steel frame structure for Elements Europe.
Get in touch
University of Sussex East Slope
Redrow £60K house for Deputy Prime Minister’s Office
Redrow £60K house for Deputy Prime Minister’s Office